修改此控制項目會使頁面自動更新

Tracking retimed footage in Motion

When working in a project that combines tracking behaviors and retiming operations, use the following guidelines for more successful results:

  • Because the Motion tracker analyzes in a project’s frame rate, ensure that the frame rate of the footage you plan to track matches the frame rate of your project. For example, to track 24 frames-per-second (fps) footage, your project’s frame rate should be 24 fps. When the tracking analysis is completed, retime the clip using the Retiming parameters in the Media list or by using the Retiming behaviors.

  • Do not retime the footage before the tracking analysis.

  • Do not retime the footage, perform a tracking analysis, then retime the footage again. This may adversely affect your tracking analysis.

Note: To track the motion of a clip after it’s retimed, export the retimed clip, then import it back into your project before you perform the tracking analysis.

Download this guide: PDF

Morty Proxy This is a proxified and sanitized view of the page, visit original site.
有幫助?
字元限制: 250
字元數目上限為 250。
感謝您提供意見。
Morty Proxy This is a proxified and sanitized view of the page, visit original site.