Skip to content

Navigation Menu

Sign in
Appearance settings

Search code, repositories, users, issues, pull requests...

Provide feedback

We read every piece of feedback, and take your input very seriously.

Saved searches

Use saved searches to filter your results more quickly

Appearance settings

gh-144681: Fix JIT trace builder assertion failure when conditional branch jump target coincides with fallthrough target#144742

Merged
Fidget-Spinner merged 7 commits into
python:mainpython/cpython:mainfrom
cocolato:fix-gh-144681cocolato/cpython:fix-gh-144681Copy head branch name to clipboard
Mar 10, 2026
Merged

gh-144681: Fix JIT trace builder assertion failure when conditional branch jump target coincides with fallthrough target#144742
Fidget-Spinner merged 7 commits into
python:mainpython/cpython:mainfrom
cocolato:fix-gh-144681cocolato/cpython:fix-gh-144681Copy head branch name to clipboard

Merge branch 'main' into fix-gh-144681

d84ef06
Select commit
Loading
Failed to load commit list.
Sign in for the full log view

The logs for this run have expired and are no longer available.

Morty Proxy This is a proxified and sanitized view of the page, visit original site.