Milestones
List view
The theory documentation must be improved.
Overdue by 1 year(s)•Due by May 30, 2025•5/6 issues closedStructure of the code should be improved. Code should be cleaned. Run time should be optimized.
Overdue by 11 month(s)•Due by September 30, 2025•14/15 issues closed