40 captures
18 Mar 2012 - 16 Feb 2026
Feb
MAR
Apr
18
2011
2012
2013
success
fail
About this capture
COLLECTED BY
Organization:
Internet Archive
The Internet Archive discovers and captures web pages through many different web crawls. At any given time several distinct crawls are running, some for months, and some every day or longer. View the web archive through the
Wayback Machine
.
Collection:
Wikipedia Outlinks February 2012
Crawl of outlinks from wikipedia.org started February, 2012. These files are currently not publicly accessible.
TIMESTAMPS
The Wayback Machine - https://web.archive.org/web/20120318190156/http://www.chinabrt.org/en/cities/urumqi.aspx
Urumqi
BRT, updated
10-Jan-2012
Links
ITDP-China
ChinaBRT.org - Bus Rapid Transit
transportPhoto.net - Photos
publicBike.net - Bike Sharing
gzWalk.net - Walking Tours
About Us
Contact Us
BRT systems
BRT photos
BRT maps
Quantitative parameters
Qualitative parameters
Guangzhou
Xiamen
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Guayaquil
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Guayaquil
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Changzhou
Chongqing
Curitiba
Dalian
Guangzhou
Hangzhou
Hefei
Istanbul
Jakarta
Jinan
Kunming
Lima
Mexico City
Nagoya
Nantes
Paris
Quito
Seoul
Urumqi
Utrecht
Xiamen
Yancheng
Zaozhuang
Zhengzhou
Peak throughput (passengers/hr/direction)
City centre peak hour speed (km/hr)
BRT system coverage (km) (1 fare)
Peak city centre buses/hr/direction
Average bus occupancy (peak hour & direction & point)
Operational mode
System passenger-trips per day
Location of busway lanes
Stations with functioning passing lanes (%)
Year system commenced
Fleet of special BRT buses
Fleet of integrated BRT feeder buses
Total length of dedicated busway (km)
Length including mixed traffic portions (km)
Number of stations
Average distance between stations (m)
Routes operating both inside & outside BRT roads
Routes operating only in busway corridors
Highest peak hour boardings at a single station
Highest full-day boardings at a single station
Station platform height (cm)
Location of bus doorways
Number of BRT terminals
Number of BRT depots
Median cash fare (yuan)
Median smart card fare (yuan)
Total planning and design costs (million yuan)
Infrastructure cost per km (million yuan)
BRT bus operator(s)
BRT bus cost - public funds (million yuan)
Number of doors in BRT buses
BRT vehicle length
No. of seats in 12m BRT buses
No. of seats in 18m BRT buses
BRT vehicle fuel
BRT bus manufacturer
Lead local design / planning work
Lead international design / planning work
Project website
BRT management agency
Segregated busways or bus-only roadways
Network of routes and corridors
Enhanced station environment (more than just a bus shelter)
High peak period operational speed (>20km/hr)
Buses operating both inside and outside the busway corridor
Majority of bus passengers in corridors carried by BRT buses
Net time saving for bus passengers in corridor
Overtaking lanes at more than half of all stations
Actual peak ridership >10,000 passengers per hr per direction
Actual peak ridership >20,000 passengers per hr per direction
Carries more people than a mixed traffic lane (~3000 pphpd)
Pre-board fare collection and fare verification
Distinctive BRT buses
Distinctive marketing identity for system
Distinctive BRT stations
Multiple stopping areas / substops
Includes BRT-only tunnels or bridges
More than one stopping position at each stop or substop
Sliding doors in BRT stations
Stations away from intersections
More than one BRT bus operator
Competitively bid operating contracts and concessions
Payment per bus-kilometre rather than per passenger
No operational subsidy from government
BRT buses paid for by operators rather than government
Independently operated and managed fare collection system
Quality control oversight from an independent entity/agency
Low-emission vehicle technology (Euro III or higher)
Automated fare collection and fare verification system
Station size based on passenger demand
Full weather protection on all station platforms
System control centre
Real-time next bus information displays
Signal priority or grade separation at intersections
At-level boarding and alighting
High capacity BRT buses
High-quality passenger information at stations
High-quality passenger information on buses
Audio announcements on BRT buses
Bicycle parking at BRT stations
Segregated bike lanes along main corridor(s)
Bike sharing in vicinity of BRT stations
Wheelchair accessible stations
BRT authority responsible for planning & control of the system
Urumqi
BRT
Year system commenced
:
2011
Trial August, operation September
Peak throughput (passengers/hr/direction)
:
7,100
North-south, AM peak, 5-6 Jan 2012 north of Hongshan Stn
City centre peak hour speed
:
10-12 km/hr
Multiple surveys, 29-Nov-2011 and 4-5 Jan 2012. Low speed mainly caused by many 4-phase intersections
Operational mode
:
trunk-only
Peak city centre buses/hr/direction
:
90
North-south, AM peak, 29-Nov-11 north of Youhao Stn. PM peak 88/hr S-N at same location
Qualitative parameters
Segregated busways or bus-only roadways
Though has many mixed traffic and poorly enforced curbside sections
Network of routes and corridors
Enhanced station environment (more than just a bus shelter)
High peak period operational speed (>20km/hr)
Buses operating both inside and outside the busway corridor
Majority of bus passengers in corridors carried by BRT buses
Net time saving for bus passengers in corridor
Probably not, given the low speeds
Overtaking lanes at more than half of all stations
Actual peak ridership >10,000 passengers per hr per direction
Actual peak ridership >20,000 passengers per hr per direction
Carries more people than a mixed traffic lane (~3000 pphpd)
Pre-board fare collection and fare verification
Distinctive BRT buses
Distinctive marketing identity for system
BRT
Distinctive BRT stations
Multiple stopping areas / substops
But limited effectiveness as no overtaking
Includes BRT-only tunnels or bridges
More than one stopping position at each stop or substop
Sliding doors in BRT stations
Stations away from intersections
No operational subsidy from government
subsidy needed
BRT buses paid for by operators rather than government
Automated fare collection and fare veri?cation system
Full weather protection on all station platforms
Real-time next bus information displays
Signal priority or grade separation at intersections
Major delays at many intersections
At-level boarding and alighting
level but sometimes large gap
High capacity BRT buses
High-quality passenger information at stations
High-quality passenger information on buses
Audio announcements on BRT buses
Real-time CCTV surveillance at all stations
Bicycle parking at BRT stations
Segregated bike lanes along main corridor(s)
Bike sharing in vicinity of BRT stations
Wheelchair accessible stations
Quantitative parameters
Location of busway lanes
:
Varies; mainly in centre
Stations with functioning passing lanes
:
2%
1 station has passing lanes, the route 2 terminal at Ertong Gongyuan
Fleet of integrated BRT feeder buses
:
0
Average bus occupancy (peak hour & direction & point)
:
87
Number of corridors
:
3
Routes operating both inside & outside BRT roads
:
3
BRT1, BRT2, BRT3
Routes operating only in busway corridors
:
3
BRT1, BRT2, BRT3
Fare type (flat, zonal, distance-based, other)
:
flat fare
Though stations in line 1 are equipped with exit card scanners
Station platform height
:
35cm
Location of bus doorways
:
Both sides
BRT1 doors on left only. BRT2 on both sides. BRT3 mainly on right, but all 12m and some 18m with doors both sides
Median cash fare (yuan)
:
1
Number of doors in BRT buses
:
3
2 in the 18m buses. Lines 2 & some of line 3 have doors in both sides
BRT vehicle length
:
12m, 18m
BRT bus manufacturer
:
Youngman
Based in Zhejiang
hide
Morty Proxy
This is a
proxified and sanitized
view of the page, visit
original site
.