Chain jobs in a batch in Compressor

You can chain jobs together, using the output of a job as the source for subsequent jobs in a batch.

  1. In the Compressor batch area, Control-click the output row that you want to use as a source, then choose New Job With Selected Output from the shortcut menu.

    A new job with a link icon appears at the bottom of the batch area.

    The batch area of Compressor showing a job chain.
  2. Add presets or other transcoding instructions to the new linked job as needed.

Download this guide: PDF

Morty Proxy This is a proxified and sanitized view of the page, visit original site.
Helpful?
Character limit: 250
Maximum character limit is 250.
Thanks for your feedback.
Morty Proxy This is a proxified and sanitized view of the page, visit original site.