Skip to content

Navigation Menu

Sign in
Appearance settings

Search code, repositories, users, issues, pull requests...

Provide feedback

We read every piece of feedback, and take your input very seriously.

Saved searches

Use saved searches to filter your results more quickly

Appearance settings

Pull requests: knative/serving

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

[wip] Prevent duplicate hosts in Ingress rules when using ACME do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#16312 opened Dec 17, 2025 by linkvt Loading…
[wip] update deps to drop h2c lib approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#16280 opened Nov 30, 2025 by dprotaso Loading…
Do not scrape pods when activator in path ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#16254 opened Nov 21, 2025 by Alexander-Kita Loading…
Add configurable probe timeout and frequency for activator ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#16250 opened Nov 20, 2025 by bindrad Loading…
Fix race condition in timeout handler causing activator crashes size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#16222 opened Nov 5, 2025 by Fedosin Loading…
Fall back to http1 on failed http2 probe needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#16205 opened Oct 31, 2025 by linkvt Loading…
Add feature flag treat-pod-as-always-schedulable needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#16146 opened Oct 14, 2025 by SaschaSchwarze0 Loading…
Configurable Load Balancing ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#16082 opened Sep 12, 2025 by elijah-rou Loading…
Ensure conections persist until done on queue-proxy drain do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#16080 opened Sep 12, 2025 by elijah-rou Loading…
ProTip! no:milestone will show everything without a milestone.
Morty Proxy This is a proxified and sanitized view of the page, visit original site.