Skip to content

Navigation Menu

Sign in
Appearance settings

Search code, repositories, users, issues, pull requests...

Provide feedback

We read every piece of feedback, and take your input very seriously.

Saved searches

Use saved searches to filter your results more quickly

Appearance settings

Conversation

mauri870
Copy link
Member

@mauri870 mauri870 commented Oct 14, 2025

Proposed commit message

Backporting tests that rely on a recent version of mock-es to other branches is currently impossible due to a breaking change in mock-es api.NewHandler. This change backports the related mock-es changes.

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

Related issues

@mauri870 mauri870 self-assigned this Oct 14, 2025
@mauri870 mauri870 added Team:Elastic-Agent-Data-Plane Label for the Agent Data Plane team backport-8.18 Automated backport to the 8.18 branch backport-9.0 Automated backport to the 9.0 branch backport-8.19 Automated backport to the 8.19 branch labels Oct 14, 2025
@botelastic botelastic bot added needs_team Indicates that the issue/PR needs a Team:* label and removed needs_team Indicates that the issue/PR needs a Team:* label labels Oct 14, 2025
Copy link
Contributor

🤖 GitHub comments

Expand to view the GitHub comments

Just comment with:

  • run docs-build : Re-trigger the docs validation. (use unformatted text in the comment!)

@elasticmachine
Copy link
Collaborator

Pinging @elastic/elastic-agent-data-plane (Team:Elastic-Agent-Data-Plane)

Copy link
Contributor

@belimawr belimawr left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM

@mauri870 mauri870 merged commit 240cb89 into elastic:9.1 Oct 15, 2025
207 checks passed
mergify bot pushed a commit that referenced this pull request Oct 15, 2025
* [9.1] Sync mock-es library with main

* update WaitForLogs msg

* update tests

(cherry picked from commit 240cb89)

# Conflicts:
#	NOTICE.txt
#	go.mod
#	go.sum
#	libbeat/tests/integration/elasticsearch_test.go
#	libbeat/tests/integration/framework.go
mergify bot pushed a commit that referenced this pull request Oct 15, 2025
* [9.1] Sync mock-es library with main

* update WaitForLogs msg

* update tests

(cherry picked from commit 240cb89)

# Conflicts:
#	NOTICE.txt
#	go.mod
#	go.sum
#	libbeat/tests/integration/elasticsearch_test.go
#	libbeat/tests/integration/framework.go
mergify bot pushed a commit that referenced this pull request Oct 15, 2025
* [9.1] Sync mock-es library with main

* update WaitForLogs msg

* update tests

(cherry picked from commit 240cb89)

# Conflicts:
#	NOTICE.txt
#	go.mod
#	go.sum
#	libbeat/tests/integration/elasticsearch_test.go
#	libbeat/tests/integration/framework.go
mauri870 added a commit that referenced this pull request Oct 15, 2025
* [9.1] Sync mock-es library with main (#47089)

* [9.1] Sync mock-es library with main

* update WaitForLogs msg

* update tests

(cherry picked from commit 240cb89)

# Conflicts:
#	NOTICE.txt
#	go.mod
#	go.sum
#	libbeat/tests/integration/elasticsearch_test.go
#	libbeat/tests/integration/framework.go

* fix conflicts

---------

Co-authored-by: Mauri de Souza Meneguzzo <mauri870@gmail.com>
mauri870 added a commit that referenced this pull request Oct 15, 2025
* [9.1] Sync mock-es library with main (#47089)

* [9.1] Sync mock-es library with main

* update WaitForLogs msg

* update tests

(cherry picked from commit 240cb89)

# Conflicts:
#	NOTICE.txt
#	go.mod
#	go.sum
#	libbeat/tests/integration/elasticsearch_test.go
#	libbeat/tests/integration/framework.go

* fix conflicts

---------

Co-authored-by: Mauri de Souza Meneguzzo <mauri870@gmail.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport-8.18 Automated backport to the 8.18 branch backport-8.19 Automated backport to the 8.19 branch backport-9.0 Automated backport to the 9.0 branch backport-9.1 Automated backport to the 9.1 branch Team:Elastic-Agent-Data-Plane Label for the Agent Data Plane team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants

Morty Proxy This is a proxified and sanitized view of the page, visit original site.