The BCrypt engine
should calculate the optimal cost factor to fit in a specific time (FAILED - 1)
[...]
Failures:
1) The BCrypt engine should calculate the optimal cost factor to fit in a specific time
Failure/Error: expect(second).to be > first
expected: > 6
got: 6